top of page

DTTW HUSKY PROJECT

  • Writer: Timothy Allen
    Timothy Allen
  • Apr 4, 2014
  • 1 min read

The welding project for Husky, Lakeland College Power Engineering Lab in Lloydminster, SK was successfully completed in April 2015. All welding was inspected and approved. The project involved high and low pressure steam, custom pipe spooling and installation from boiler to turbine. It was a large project and took a total of one year to finish with all work completed according to the client's requirements.

Kiwi popsicle

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2014 by K-Town Web Design & SEO

  • w-facebook
  • Twitter Clean
  • w-googleplus
bottom of page