top of page

DTTW HUSKY PROJECT

The welding project for Husky, Lakeland College Power Engineering Lab in Lloydminster, SK was successfully completed in April 2015. All welding was inspected and approved. The project involved high and low pressure steam, custom pipe spooling and installation from boiler to turbine. It was a large project and took a total of one year to finish with all work completed according to the client's requirements.

Tags:

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page